Outage start | Monday, October 04, 2021 9 a.m. |
Expected end | Tuesday, October 05, 2021 8:32 p.m. |
Update: 7:30pm CST: Existing user instances are reachable, and baremetal nodes can be deployed.
Update: 8:30pm CST: Regular functionality is restored, with the following exceptions
- Heat Orchestration may encounter issues.
- Bring-your-own-controller SDN experiments at UC are not available.
- Gnocchi at UC is not available, but was also completely unused.
This page will be updated as services are tested.
We will have a full day outage at CHI@UC in order to migrate our control plane to new hardware, in preparation for the additon of new physical networks and compute nodes. Existing leases and nodes will be unchanged, but not accessible for the duration.
Other sites will not be affected.
The outage will start 9AM on Monday, October 4th, and continue until 9AM Tuesday, October 5th.